Water Damage Restoration Estimate Template
Extraction, air movers and dehumidifier days, priced against a drying goal rather than a fixed date. Free PDF.
A water loss is the one job that is still happening while you price it. Water is still in the joists, the category may reclassify overnight, and the equipment stays until the readings say it can leave — not until a date somebody wrote down. So a restoration estimate is a daily one: equipment by the unit per day, a stated drying goal, and a clear line between drying the structure and rebuilding what had to come out.
|
ESTIMATE
Issued
|
|
Issued by
Tidewater Restoration Group
4102 North 22nd Street 33605 Tampa, FL United States dispatch@tidewaterrestore.example |
Bill to
Ronald Whitcombe
2554 Palmetto Grove 33511 Brandon, FL United States r.whitcombe@example.com |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Emergency response, extraction and initial readings Category 2, Class 3; kitchen, hall and two bedrooms | 1 | $1,180.00 | — | $1,180.00 |
Air movers — per unit per day 11 units, projected 4 days; billed by the day placed | 44 | $34.00 | — | $1,496.00 |
LGR dehumidifiers — per unit per day 3 units, projected 4 days; monitored daily against the drying goal | 12 | $112.00 | — | $1,344.00 |
Antimicrobial application and containment Affected areas only; barrier at the hall doorway | 1 | $640.00 | — | $640.00 |
|
What this estimate commits you to
- How long it stands
- Seven days, and less in practice — this is a loss in progress, and every day the material stays wet moves the job from drying towards demolition.
- What it does not cover
- The rebuild. This price dries, cleans and disinfects the structure; replacing drywall, cabinetry, flooring, trim and paint is estimated separately once the readings are dry, as is contents cleaning and off-site storage.
- What would change the price
- The daily monitoring log. Equipment stays until the readings reach the drying goal, so the days here are a projection; water reclassified from Category 2 to Category 3 changes what may be dried rather than removed, and hidden saturation found in a wall cavity adds both.
- How the client accepts it
- Sign the work authorisation and the crew stays on site today; your carrier's approval of scope follows on the same document, and the deductible is what you owe us directly if the claim is paid.
Edit this template Free, no account, no watermark — download the PDF when you are done.
When the work is done, invoice it →
What to put on a water damage restoration estimate
- The category of water and the class of loss, because both decide what can be dried rather than removed
- Affected areas and the moisture readings they were taken from, room by room
- Equipment as a count and a day rate — air movers, LGR dehumidifiers, air scrubbers — with an expected number of days
- The drying goal: the reading the unaffected material sits at, which is what the equipment is aiming for
- Antimicrobial application and containment where the category calls for it
- That the rebuild is a separate estimate, written once the structure reads dry
Questions
How can I estimate drying days before the structure is dry?
As a projection with a rate attached. State the equipment count, the day rate and the number of days you expect, then monitor daily and bill the days used. Every insurer in the country reads restoration estimates this way, and a flat drying price is the one thing an adjuster will not approve on sight.
What changes if the water is reclassified as Category 3?
What can be saved. Category 3 water means porous material is removed rather than dried — carpet, pad, drywall to a cut line — so containment, disposal and demolition enter a price that was written for drying. Reclassification is a new estimate, and the original should say so.
Who does this estimate go to, the homeowner or the insurer?
Both, and it is written for the adjuster while being signed by the homeowner. The homeowner signs the work authorisation so the crew can start today; the carrier approves the scope afterwards, and the deductible is the part the homeowner owes you either way.
Ready to send it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Web Development Discovery spike — practice management API · Phase 1 — patient booking flow · Phase 2 — records migration
- Well Drilling Rig mobilisation to site · Drilling — per foot · Steel casing and grout seal — per foot
- Appliance Repair Service call and diagnosis · Main control board, part W11319977 · Labour — fit and test
- Auto Body Body labour — front bumper, fender, headlamp mount · Refinish labour including blend to adjacent door · Parts — OEM bumper cover, aftermarket fender
- Auto Repair Diagnosis — coolant loss, no visible leak · Water pump and thermostat housing — aftermarket · Labour — 3.4 book hours at 142.00
- Construction Demolition and temporary protection · Framing, structural beam and rough carpentry · Mechanical, electrical and plumbing rough-in
- Demolition Structure teardown — 2,400 sq ft wood frame, two storey · Disposal — estimated tonnage · Hazardous material survey
- Event Planning Planning and management fee · Catering — per head, estimated at 140 guests · Venue hire and staffing