Free — no sign-up, no watermark
Estimate templates by trade
An estimate is a price given before anyone knows what is under the floor. These start from the lines your trade actually prices, and say plainly what would move the number.
- Appliance Repair Service call and diagnosis · Main control board, part W11319977 · Labour — fit and test · Door latch switch assembly
- Auto Body Body labour — front bumper, fender, headlamp mount · Refinish labour including blend to adjacent door · Parts — OEM bumper cover, aftermarket fender · Front radar sensor recalibration
- Auto Repair Diagnosis — coolant loss, no visible leak · Water pump and thermostat housing — aftermarket · Labour — 3.4 book hours at 142.00 · Coolant, gaskets and shop supplies
- Construction Demolition and temporary protection · Framing, structural beam and rough carpentry · Mechanical, electrical and plumbing rough-in · Allowance — cabinetry, tile and appliances
- Demolition Structure teardown — 2,400 sq ft wood frame, two storey · Disposal — estimated tonnage · Hazardous material survey · Backfill and rough grade
- Event Planning Planning and management fee · Catering — per head, estimated at 140 guests · Venue hire and staffing · Florals, rentals and lighting
- Excavation Mobilisation and demobilisation · Basement excavation — 22 ton excavator with operator · Spoil haul-off · Rock allowance — hydraulic hammer
- Flooring Engineered white oak, 7in plank — material · Installation labour — glue-down · Carpet and pad removal, haul-away · Allowance — subfloor levelling
- Foundation Repair Driven steel piers — exterior, per pier · Additional pier section, per foot past refusal depth carried · Structural engineer — scope, observation and letter · Access excavation and backfill
- Handyman Labour — half day, items 1 to 4 · Item 5 — kitchen tap replacement, time and materials · Materials from the van · Trip charge
- Interior Design Design fee — concept and two revision rounds · Furnishings budget — estimated, payable to suppliers · Procurement and order management · Freight, receiving and white-glove install
- Junk Removal Three-quarter truck load · Basement carry and stair labour · Special handling — mattress and box spring · Appliance with refrigerant — refrigerator
- Moving Company Transportation — estimated 9,400 lb, 101 miles interstate · Packing materials and packing labour · Full value protection, 60,000 declared · Shuttle and long carry at destination — provisional
- Plumbing Camera inspection and line locate · Sewer line replacement — open cut · Cleanout installation to code · Permit and inspection
- Pool Service Drain, chip-out and bond coat — per sq ft · Pebble interior finish, applied · Waterline tile and coping — per linear ft · Variable-speed pump and cartridge filter
- Private Investigator Surveillance — field hours, single investigator · Second investigator — where a follow requires it · Records and database research · Report preparation, stills and video handling
- Roofing Tear-off and disposal — one layer assumed · Architectural shingle system, supplied and installed · Underlayment, ice-and-water barrier and drip edge · Allowance — decking replacement
- Septic System Soil evaluation and perc test · 1,250 gallon concrete tank, supplied and set · Drainfield — conventional gravity trench, per linear foot · Old tank pumped and crushed in place
- Upholstery Three-seat sofa — strip, rebuild and re-cover · Fabric — per yard, plain weave · Foam, dacron wrap and new webbing · Allowance — frame joint repair
- Veterinary Pre-anaesthetic examination and bloodwork · Dental radiographs, full mouth · Anaesthesia and monitoring — 60 minutes, per 30 minutes · Scale, polish and the two extractions already visible
- Water Damage Restoration Emergency response, extraction and initial readings · Air movers — per unit per day · LGR dehumidifiers — per unit per day · Antimicrobial application and containment
- Web Development Discovery spike — practice management API · Phase 1 — patient booking flow · Phase 2 — records migration · Accessibility audit and remediation
- Well Drilling Rig mobilisation to site · Drilling — per foot · Steel casing and grout seal — per foot · Pump, pressure tank, wiring and control package
Start from a blank estimate None of these 23 is your trade? Start from a blank one — free, no account, no watermark.
One job, three documents: estimate templates, quote templates, invoice templates — price the work first, then bill it.