Free — no sign-up, no watermark

Roofing Estimate Template

Squares, tear-off, underlayment and a decking allowance — priced before anyone has seen the deck. Free PDF, no sign-up.

Edit this template

Nobody has seen the roof you are pricing. You have measured it from the ground, from the drive-through photographs or from a satellite report, and everything that matters — how many layers are up there, whether the deck is sound, what the flashing looks like under the shingle — is under a covering nobody will lift until the crew arrives. A roofing estimate is honest about that gap: it prices what can be measured, carries an allowance for what cannot, and names the moment the number stops being a guess.

ESTIMATE Issued
Estimate number:EST-1042
Date of issue:August 6, 2026
Valid until:September 5, 2026
Currency:USD
Issued by
Summit Ridge Roofing
1420 East 12th Street
64108 Kansas City, MO
United States
estimates@summitridgeroof.example
Bill to
Harriet Lindqvist
2210 Overlook Drive
66204 Overland Park, KS
United States
h.lindqvist@example.com
Estimated total
$12,364.00
Valid for 30 more days · Sep 5, 2026
This is an estimate, not a bill. Prices may change.
How this was measured
Squares are taken from an aerial measurement report and confirmed at the eave. Layer count is assumed from the rake edge and cannot be confirmed until tear-off begins.
Description Qty Rate Tax Amount
Tear-off and disposal — one layer assumed
26 squares, 6:12 pitch, two-storey; a second layer is billed at 44.00 per square
26$92.00$2,392.00
Architectural shingle system, supplied and installed
Manufacturer's system warranty registered in the homeowner's name
26$312.00$8,112.00
Underlayment, ice-and-water barrier and drip edge
Synthetic underlayment throughout; barrier to eaves and valleys
1$1,180.00$1,180.00
Allowance — decking replacement
Provisional 10 sheets of 7/16 OSB; billed by the sheet actually replaced
10$68.00$680.00
Subtotal$12,364.00
Total$12,364.00
Terms
Deposit due on acceptance, balance on completion. Workmanship warranted 10 years; the material warranty is the manufacturer's.
Estimate #EST-1042 · Summit Ridge Roofing · Page 1 of 1

What this estimate commits you to

How long it stands
Thirty days. Shingle and underlayment are held at the supply house's price for the week, and a manufacturer's mid-season increase lands with about a fortnight's notice.
What it does not cover
Everything under the shingles. Decking beyond the allowance, rafters, fascia and any rot found once the covering is off are priced when they are exposed, as is gutter replacement and interior repair to ceilings already stained.
What would change the price
A second or third layer of old covering found at tear-off, decking replaced past the ten sheets allowed for, and chimney or skylight flashing that turns out to be rusted through rather than resealable.
How the client accepts it
Sign the estimate and pay the deposit that holds a week in the crew schedule; the dumpster and the material drop are booked against that date, and a date moved after the drop carries the redelivery.

Edit this template Free, no account, no watermark — download the PDF when you are done.

What to put on a roofing estimate

  • The measured area in squares, with the pitch and the number of storeys the labour rate assumes
  • Tear-off priced for the layers you expect, and the rate per square for a second layer if one appears
  • A decking allowance shown as an allowance — a sheet count you expect, at a stated rate per sheet
  • Underlayment, ice-and-water barrier and drip edge as their own lines, since a cheaper bid usually differs here
  • The manufacturer's system being installed, because a warranty follows the system rather than the shingle
  • How long the material price is held, and who carries a supplier's increase if the job slips a season

Questions

How do I estimate decking I cannot see?

As an allowance, not as a promise. Put a sheet count on the estimate at a stated rate per sheet, say plainly that it is billed by what is actually replaced, and photograph the deck before the new covering goes on. A homeowner who was told the number could move accepts it; one who reads it first on the invoice does not.

Should a roofing estimate assume one layer or two?

State which you assumed. Layer count changes tear-off labour and disposal tonnage together, and it is the single most common reason two bids on the same roof are hundreds of dollars apart.

How long should a roofing estimate stand?

Long enough for a homeowner to get a second bid and no longer than your supply house holds a price — thirty days is the usual compromise. Asphalt has had mid-season increases announced with a fortnight's notice, and an estimate with no expiry is one you will be asked to honour a year later.

Ready to send it?

The template opens in the editor with these lines already on it. Change what you like, download the PDF.

Edit this template

Other trades

Browse all 23 estimate templates