Roofing Invoice Template
Tear-off, squares of material, dumpster and labour — the way a roof is actually billed. Free PDF, no sign-up.
A roof is quoted by the square and billed by what was found once the old covering came off. That gap between quote and invoice is where roofing disputes live, so the invoice has to show the original scope and anything added to it as distinct lines, with the reason attached to each.
|
INVOICE
Issued
|
|
Issued by
Summit Ridge Roofing
77 Gable Street 64108 Kansas City, MO United States office@summitridgeroof.example |
Bill to
Harriet Lindqvist
2210 Overlook Drive 66204 Overland Park, KS United States h.lindqvist@example.com |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Tear-off — existing asphalt shingle 28 squares, single layer | 28 | $78.00 | — | $2,184.00 |
Architectural shingle, weathered wood Supplied and installed, 30-year material warranty | 28 | $295.00 | — | $8,260.00 |
Decking replacement 7/16 OSB, found rotten after tear-off, 9 sheets | 9 | $64.00 | — | $576.00 |
Dumpster and haul-away 30-yard, one exchange | 1 | $620.00 | — | $620.00 |
|
Edit this template Free, no account, no watermark — download the PDF when you are done.
What to put on a roofing invoice
- The roof area in squares, and the material by name and colour
- Tear-off and disposal as their own lines — dumpster costs are real and invisible otherwise
- Decking replacement by the sheet, since it is the classic post-tear-off addition
- Flashing, vents and any penetration work itemised
- The warranty on materials and the separate warranty on workmanship
- Any insurance claim or adjuster reference the invoice has to be matched to
Questions
How do I bill decking found rotten after tear-off?
By the sheet, on its own line, with a note saying it was discovered after tear-off. It is the single most disputed line on a roofing invoice, and the only defence is that the invoice said what it was and when it was found.
Should disposal be a separate line?
Yes. A dumpster and its haul-away is a cost the homeowner can look up, and burying it in labour makes the labour rate look inflated rather than making the disposal look free.
Ready to bill for it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Salon Full head colour — senior stylist · Cut and finish · Bond-building treatment
- Security Guard Gatehouse post — regular hours · Gatehouse post — overtime hours · Holiday cover
- Septic Service Tank pumping — 1,250 gallon · Disposal fee · Effluent filter — clean and replace
- Small Engine Repair Bench diagnostic · Carburettor rebuild kit · Fuel line, filter and spark plug
- Snow Removal Lot clearing — 2 to 4 inch band · Lot clearing — 4 to 8 inch band · Salting
- Solar Installation PV system — 8.4 kW DC · Inverter and monitoring · Permitting and inspection
- Speech Therapy 92523 — Evaluation of speech sound and language · 92507 — Individual speech treatment · 92507 — Individual speech treatment, telehealth
- Sports Coaching Team training sessions · Small-group technical · Indoor facility hire