Event Planning Invoice Template
Planning fee, vendor coordination, on-the-day hours and pass-through costs. Free PDF, no sign-up.
An event planner's invoice carries two very different kinds of money: the fee for the work, and the far larger sums paid to venues and vendors on the client's behalf. Mixing them makes the fee look enormous and the pass-throughs look like profit, so they belong in clearly separate blocks with the fee basis stated.
|
INVOICE
Issued
|
|
Issued by
Marguerite Vance Events
18 Pavilion Street 29401 Charleston, SC United States studio@margueritevance.example |
Bill to
Lucerne Biotech — Annual Summit
3300 Innovation Drive 27703 Raleigh, NC United States events@lucernebiotech.example |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Planning fee — phase 2 Programme design, run of show, supplier briefs | 1 | $7,400.00 | — | $7,400.00 |
Vendor coordination Nine suppliers contracted and scheduled | 26 | $125.00 | — | $3,250.00 |
On-the-day coordination Two coordinators, setup through breakdown, 14 hours each | 28 | $95.00 | — | $2,660.00 |
AV and staging — paid on client's behalf Contracted in our name, at cost, invoice attached | 1 | $11,800.00 | — | $11,800.00 |
|
Edit this template Free, no account, no watermark — download the PDF when you are done.
How to invoice as a event planning →
What to put on a event planning invoice
- The event name and date, since planning invoices arrive months apart
- The planning fee and whether it is flat, hourly or a percentage of spend
- Vendor payments made on the client's behalf, listed at cost
- On-the-day coordination hours, including the setup and breakdown either side
- Any commission received from vendors, disclosed rather than netted off quietly
- The payment schedule this invoice sits within
Questions
Should vendor payments go through my invoice at all?
Only if you are contracting with the vendors yourself. If you are, list them at cost and separately from your fee; if you are not, keep them off the invoice entirely and let the client pay direct.
Do I have to disclose vendor commissions?
Ethically yes, and in many markets contractually too. A commission discovered later costs the referral network that produced it, which is worth far more than the commission.
Ready to bill for it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Excavation Excavator — 8 ton, with operator · Skid steer — with operator · Haul-off
- Coaching Coaching sessions — 90 minutes · 360 feedback assessment · Sponsor alignment meetings
- Fencing Cedar privacy fence — 6 ft · Gates · Rock excavation
- Flooring Engineered oak, 7in plank · Removal and disposal of carpet · Subfloor levelling
- Food Truck Event minimum — met · Travel and setup · Generator hire
- Foundation Repair Steel piers — driven to refusal · Engineering plan and observation · Excavation and restoration
- Freelance Writing Feature — "The last mile of the grid" · Research and interviews · Revision round
- Freight Broker Linehaul — Allentown to Columbus · Fuel surcharge · Detention at delivery