Flooring Invoice Template
Square footage, subfloor prep, underlayment and disposal — billed the way flooring jobs are. Free PDF, no sign-up.
Flooring is sold by the square foot and installed against whatever the old floor was hiding. Levelling compound, a soft subfloor, a doorway that has to be undercut — none of that is in the quote, and all of it is in the invoice. Keeping material and preparation on separate lines is what lets a customer see that the price of the floor did not change.
|
INVOICE
Issued
|
|
Issued by
Meridian Floor Works
1450 Trowel Street 53204 Milwaukee, WI United States billing@meridianfloors.example |
Bill to
Garrett Osei
88 Lakeshore Way 53213 Wauwatosa, WI United States g.osei@example.com |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Engineered oak, 7in plank Ordered 480 sq ft to lay 440 sq ft, 9% waste factor | 480 | $6.40 | WI Sales Tax (7.9%) | $3,072.00 |
Removal and disposal of carpet 440 sq ft, including tack strip and haul-away | 1 | $385.00 | — | $385.00 |
Subfloor levelling Self-levelling compound, 120 sq ft of low spots | 120 | $3.20 | — | $384.00 |
Installation labour Glue-down, including undercutting four doorways | 440 | $3.75 | — | $1,650.00 |
|
Edit this template Free, no account, no watermark — download the PDF when you are done.
What to put on a flooring invoice
- The area in square feet, with waste factor stated if you charge for it
- Material by product name, so it can be matched to what was chosen in the showroom
- Removal and disposal of the old floor, as its own line
- Subfloor preparation — levelling, patching, moisture barrier — itemised
- Underlayment separately from the flooring it sits under
- Transitions, thresholds and trim, which are always more numerous than expected
Questions
Do I bill for waste?
If you charge for the material ordered rather than the material laid, say so — a line reading 480 sq ft against a 440 sq ft room is a query waiting to happen unless the invoice explains the difference.
How should subfloor levelling appear?
On its own line, with the area treated. It is the most common addition to a flooring job and the least expected by the customer, so it needs to read as work done rather than as the floor having quietly become more expensive.
Ready to bill for it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Food Truck Event minimum — met · Travel and setup · Generator hire
- Foundation Repair Steel piers — driven to refusal · Engineering plan and observation · Excavation and restoration
- Freelance Writing Feature — "The last mile of the grid" · Research and interviews · Revision round
- Freight Broker Linehaul — Allentown to Columbus · Fuel surcharge · Detention at delivery
- Funeral Home Basic services of funeral director and staff · Transfer of remains and embalming · Casket — poplar, satin interior
- Garage Door Service call · Torsion springs — 25,000 cycle · Cables and centre bearing
- Glass and Glazing Insulated unit — 48 x 36 in., low-E · Tempered unit — door sidelight · Site measure
- Graphic Design Brand identity — three concepts · Revision rounds · Additional revision round