Architecture Quote Template
Fees by phase, deliverables listed, consultants excluded, changes at a named rate. Free PDF, no sign-up.
An architect quotes a fee, not a building — and the fee is fixed because the phases are defined and the deliverables at the end of each one are listed. That is the whole discipline of the document: schematic design produces these drawings, design development produces those, and the client's approval closes the phase. Everything the practice cannot control — engineers, permit fees, surveys — is named as somebody else's cost, and a change after sign-off has an hourly rate waiting for it.
|
QUOTE
Issued
|
|
Issued by
Ravensmoor Architects
19 North Second Street 55401 Minneapolis, MN United States studio@ravensmoorarch.example |
Bill to
Oliver and Sanne Marchetti
2840 Kenwood Parkway 55405 Minneapolis, MN United States marchetti.house@example.com |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Phase 1 — Schematic design Site analysis, two plan options, massing model, two review meetings | 1 | $9,800.00 | — | $9,800.00 |
Phase 2 — Design development Developed plans, sections, elevations, outline specification | 1 | $14,500.00 | — | $14,500.00 |
Phase 3 — Construction documents Permit and tender set, coordinated with consultants' drawings | 1 | $21,000.00 | — | $21,000.00 |
Phase 4 — Construction administration Twelve site visits, RFI and submittal review, punch list | 1 | $11,200.00 | — | $11,200.00 |
|
What this quote commits you to
- How long it stands
- 60 days, since a fee built on a defined scope should outlast the client's own approval cycle rather than expire inside it.
- What it does not cover
- Structural, MEP and civil engineering by consultants, permit and agency review fees, land surveys, and renderings beyond the two included.
- What would change the price
- A change to the programme or the floor area after a phase is signed off, charged as additional services at the hourly rates listed.
- How the client accepts it
- Countersign the fee proposal; the phases run in the order listed and each is invoiced on its own completion.
Edit this template Free, no account, no watermark — download the PDF when you are done.
When the work is done, invoice it →
What to put on an architecture quote
- The phases by name, with the fee against each rather than one number for all of them
- Deliverables listed per phase — drawing sets, models, renderings, by count
- The number of client review meetings included in each phase
- Consultants excluded by discipline: structural, MEP, civil, landscape
- Permit expediting and agency fees, stated as reimbursable or excluded
- The hourly rates by grade that additional services will be charged at
- Whether construction administration is included, and how many site visits it carries
Questions
Should an architect quote a percentage of construction cost or a fixed fee?
For a defined scope, a fixed fee per phase is the more honest document — a percentage floats on a number nobody knows yet and rewards a more expensive building. If you do use a percentage, say what construction cost it is calculated against and when it is recalculated.
What closes a phase?
The client's written approval of the deliverables listed for it. Without that line, design development becomes a place where schematic decisions get reopened for free, which is where practices lose fees they had properly quoted.
How should changes after sign-off be handled?
As additional services at the hourly rates on the quote. The rate table is what turns 'can we look at moving the stair' from an awkward negotiation into an administrative one.
Does this work for a consulting engineer's fee quote?
Yes — structural, civil and MEP fees have the same shape: phases, deliverables per phase, and additional services at named hourly rates. Two things invert. The exclusions run the other way, because the engineer excludes the architectural scope and the other disciplines rather than the engineering; and the stamped calculation is what the engineer is selling, so it belongs in the deliverables list rather than in the exclusions, with the code edition the calculations are performed to named beside it.
Ready to send it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Bartending Bartenders — 5 hour service · Bar back and ice runner · Mixers, garnish and ice package
- Bookkeeping Monthly bookkeeping — 200-350 transactions · Monthly management reports · Catch-up — prior nine months
- Carpentry Site measure and shop drawings · Bench time — window seat and flanking presses · Fitting on site
- Catering Plated three-course dinner · Passed canapés — reception hour · Service staff
- Cleaning Services Nightly office cleaning · Restroom service · Carpet extraction
- Consulting Workstream 1 — Commercial diagnostic · Workstream 2 — Customer interviews · Board presentation and written report
- DJ Services Reception DJ — 5 hours playing · Ceremony sound system · Set-up, sound check and pack-down
- Drywall Hang 1/2 in. board, walls and ceilings · Hang 5/8 in. type X, garage ceiling and party wall · Tape and finish to level 4