Architecture Invoice Template
Phase billing, percentage fees, consultants and reimbursables. Free PDF, no sign-up.
Architectural fees are usually a percentage of a construction cost that keeps moving, billed across phases that overlap. The invoice has to say which phase, what percentage of it is complete, and what the fee is being calculated against — otherwise the client is checking arithmetic they cannot see.
|
INVOICE
Issued
|
|
Issued by
Verity Hall Architects
12 Drafting Court 97205 Portland, OR United States accounts@verityhall.example |
Bill to
Alderbrook Development LLC
900 Riverfront Way 98660 Vancouver, WA United States finance@alderbrookdev.example |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Design development — 40% of phase Phase fee $84,000; 65% complete now, 25% previously invoiced | 1 | $33,600.00 | — | $33,600.00 |
Structural consultant Wexler Engineering, at cost, invoice attached | 1 | $9,400.00 | — | $9,400.00 |
Additional services — revised massing Client-requested option study, 26 hours | 26 | $190.00 | — | $4,940.00 |
Reimbursables Large-format printing and permit application fees | 1 | $1,180.00 | — | $1,180.00 |
|
Edit this template Free, no account, no watermark — download the PDF when you are done.
What to put on a architecture invoice
- The project name and number, and the phase being billed
- The fee basis: percentage of construction cost, fixed fee, or hourly
- Percentage of the phase complete, and what was invoiced previously
- Consultant fees — structural, MEP, civil — passed through and named
- Reimbursables such as printing, permits and travel, at cost
- Additional services outside the agreement, each with its authorisation
Questions
How do I show percentage-of-phase billing?
State the phase fee, the percentage complete now, the percentage previously invoiced, and the difference. Four numbers turn an unverifiable figure into arithmetic the client can follow.
Should consultants be billed through me?
Only if you hold their contracts. If you do, list them individually at cost or with a stated coordination fee — a lump 'consultants' line is the one that stalls in review.
Ready to bill for it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Auto Body Body labour · Refinish labour · Parts — OEM, as approved
- Auto Detailing Full interior detail — mid-size SUV · Two-step paint correction · Ceramic coating — 3 year
- Auto Repair Diagnostic — intermittent misfire · Ignition coil pack · Spark plugs, set of six
- Bartending Bartenders · Barback · Mixers, ice and garnish
- Bookkeeping Monthly bookkeeping retainer · Payroll runs · Prior-year clean-up
- Charter Bus 56-seat motorcoach — trip hours · Mileage · Driver overnight
- Carpentry Templating and drawings · Shop time — cabinet build · Site time — fitting
- Catering Three-course dinner, per head · Canapés on arrival, per head · Service staff