Cleaning Services Quote Template
Scope by area and frequency, hours behind the price, consumables named. Free PDF, no sign-up.
A cleaning price is a walkthrough turned into hours: square footage, fixture count, floor types and how often each area is touched. All of it is measurable before the first shift, which is why janitorial work quotes rather than estimates. The document's job is to make the scope legible — what gets done nightly, what weekly, what monthly — because a cleaning complaint is almost always a disagreement about frequency rather than about quality.
|
QUOTE
Issued
|
|
Issued by
Clearcourt Facility Services
150 Southwest Boulevard 64111 Kansas City, MO United States bids@clearcourtfs.example |
Bill to
Harbourline Insurance Offices
3400 Main Street 64111 Kansas City, MO United States facilities@harbourlineins.example |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Nightly office cleaning 18,400 sq ft, two cleaners at four hours, 22 nights in the month | 22 | $168.00 | — | $3,696.00 |
Restroom service Six restrooms, 34 fixtures, sanitised and restocked on each of the 22 nights | 22 | $62.00 | — | $1,364.00 |
Carpet extraction Open-plan and corridors, quarterly | 1 | $1,240.00 | — | $1,240.00 |
Hard floor strip and wax Lobby and break room, twice a year, out of hours | 1 | $980.00 | — | $980.00 |
|
What this quote commits you to
- How long it stands
- 30 days, priced from the walkthrough on the square footage and fixture count recorded that day.
- What it does not cover
- The consumable supplies themselves — paper, soap and liners, which you purchase — exterior windows above ground level, and post-construction debris.
- What would change the price
- A change of frequency, an area added to the scope, or a shift moved outside the hours the crew rate is built on.
- How the client accepts it
- Sign the service agreement; the first clean is scheduled within a week of keys and alarm codes being issued.
Edit this template Free, no account, no watermark — download the PDF when you are done.
When the work is done, invoice it
What to put on a cleaning services quote
- Areas listed with the square footage and floor type of each
- Task frequency per area: nightly, weekly, monthly, quarterly
- Restroom fixture count, which is what actually drives the labour
- Crew size and shift hours the price is built on
- Consumables — paper, liners, soap — supplied by you or by the client
- Periodic work quoted separately: strip and wax, carpet extraction, windows
- Access arrangements, alarm codes and who holds the keys
Questions
Should a cleaning quote show the hours?
Showing crew size and shift length makes an otherwise opaque number checkable, and it protects you when a client compares against a bid that quietly assumes half the labour. The hours are also the honest basis for any later change of scope.
How should periodic work be handled?
As separate priced lines with their own frequency, never folded into the monthly rate. Strip and wax twice a year inside a monthly fee is invisible to the client, so they will believe it costs nothing and ask for it quarterly.
Who supplies the consumables?
Whichever you agree, but write it down. Paper and liners are a genuine monthly cost that scales with occupancy, and a contract that is silent about them is a contract with an unpriced variable in it.
About the free quote generator
Is this quote generator really free?
Yes. There is no fee, no trial period and no watermark on the PDF. Nothing on this page requires a credit card.
What is the difference between a quote and an estimate?
A quote is a fixed price you are offering to hold, and it is binding on you once the client accepts it. An estimate is your best projection of the cost and can move if the job does. If the scope is not settled yet, send an estimate instead.
Is a quote legally binding?
Once a client accepts it within the period it stands, a quote generally forms a contract at that price — the details depend on your jurisdiction and on what the document itself says. That is why the price, the scope and the exclusions all belong in writing, and why the document prints the date the offer expires.
How long should a quote be valid until?
Thirty days is the common default, and two weeks is sensible when materials prices are moving. Whatever you choose, state it on the quote: an offer with no expiry is an offer you have made for ever.
Can I raise the price after the client accepts?
Not unilaterally, which is the point of quoting rather than estimating. What you can do is price the variations the client asks for afterwards, provided the quote said what was and was not included.
Do I need to create an account?
No. Fill in the form and download the PDF directly — there is no sign-up and no login for this tool.
Can the client accept the quote online?
Not from a downloaded PDF. Saving the quote to an account gives it a link the client opens and answers on, and the acceptance is recorded against the document rather than living in an email thread.
Can I use this for any currency or country?
Yes. Choose any currency and country for either party — the totals and formatting follow your selection.
Ready to send it?
The template opens in the free quote generator with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Consulting Workstream 1 — Commercial diagnostic · Workstream 2 — Customer interviews · Board presentation and written report
- DJ Services Reception DJ — 5 hours playing · Ceremony sound system · Set-up, sound check and pack-down
- Drywall Hang 1/2 in. board, walls and ceilings · Hang 5/8 in. type X, garage ceiling and party wall · Tape and finish to level 4
- Electrical 200A service panel replacement · Dedicated 20A kitchen circuits · Device installation
- Environmental Consulting Report preparation and professional review · Regulatory database and historical records · Site reconnaissance and interviews
- Executive Coaching Coaching sessions — 90 minutes · Three-way goal setting and review · Leadership assessment and debrief
- Fencing 6 ft cedar privacy fence · 4x4 posts set in concrete · Gates
- Formal Base bid — access control system · Base bid — installation and commissioning · Training, per specification 5.2