Free — no sign-up, no watermark

HVAC Quote Template

Condenser, air handler, line set and permit, priced to the model number. Free PDF, no sign-up.

Edit this template

A changeout can be priced before anyone starts because everything that decides the number is visible: the tonnage the house calls for, the model being installed, the length of the line set and whether the ducts can carry the new blower. So an HVAC quote is a commitment rather than a guess — but it commits to a model number and a distributor's price, and both have a shelf life. Name the equipment on the document and the price stands on something a homeowner can check.

QUOTE Issued
Quote number:QUO-1044
Date of issue:August 6, 2026
Valid until:September 5, 2026
Currency:USD
Issued by
Meridian Air Systems
3418 South Harvard Avenue
74107 Tulsa, OK
United States
quotes@meridianair.example
Bill to
Dana Whitfield
1207 Hawthorne Circle
74012 Broken Arrow, OK
United States
d.whitfield@example.com
Quoted price
$7,271.00
Valid for 30 more days · Sep 5, 2026
Fixed price, valid until September 5, 2026.
Scope
Equipment is quoted to the model numbers above. The existing duct trunk is reused; the return drop is rebuilt because the measured static pressure will not let the new blower reach its rated airflow.
Description Qty Rate Tax Amount
3-ton condenser, 15.2 SEER2
Supplied and set on a new composite pad, R-454B
1$3,480.00$3,480.00
Matched air handler with TXV coil
Installed in the attic platform, new secondary pan and float switch
1$2,260.00$2,260.00
Line set replacement
32 feet, insulated, run through the existing chase
32$18.00$576.00
Return drop and plenum rebuild
Static pressure measured at 0.92 in. w.c.; return upsized to 20 in.
1$740.00$740.00
Mechanical permit and inspection
Pulled in the homeowner's jurisdiction, inspection attended
1$215.00$215.00
Subtotal$7,271.00
Total$7,271.00
Terms
Valid 30 days. 40% on release of equipment, balance on completed inspection. Labour warranted 2 years; equipment carries the manufacturer's 10-year parts warranty once registered.
Quote #QUO-1044 · Meridian Air Systems · Page 1 of 1

What this quote commits you to

How long it stands
30 days. Our distributor holds equipment pricing for that window; past it the condenser and air handler are re-priced at the day's list.
What it does not cover
Electrical service upgrades, gas line alterations, permits pulled by anyone else, and abatement of asbestos or vermiculite found in the plenum.
What would change the price
A duct system that fails its static pressure test once the new blower is in, or a line set that cannot be reused after the nitrogen pressure test.
How the client accepts it
Sign the quote and pick an installation week; equipment is not released from the distributor until both have come back.

Edit this template Free, no account, no watermark — download the PDF when you are done.

What to put on an HVAC quote

  • The condenser and air handler by model number, not by tonnage alone
  • SEER2 rating, because it is what the rebate and the comparison shopping turn on
  • Line set: reused, or replaced, and how many feet of it
  • The permit and the mechanical inspection as their own line
  • Whether the existing duct work was static-pressure tested, and what the test said
  • Manufacturer warranty on the equipment and your own labour warranty, stated separately
  • The utility or manufacturer rebate you will file on the homeowner's behalf

Questions

How long should an HVAC quote stay valid?

As long as your distributor holds equipment pricing to you, which is usually thirty days. Quoting sixty on a condenser you can only buy at thirty means eating the difference or reopening a price the homeowner thought was settled.

Should the quote name the model number?

Yes, and it is the single most useful line on the document. A homeowner comparing three quotes on tonnage alone is comparing nothing; a model number lets them see that one bid is a builder-grade single stage and another is a two-stage unit.

What if the ducts cannot handle the new system?

That is what the static pressure test is for, and it belongs on the quote as a finding rather than as an assumption. If the test has not been done, say so and name the return-drop work as a priced option instead of leaving it to surface on install day.

Ready to send it?

The template opens in the editor with these lines already on it. Change what you like, download the PDF.

Edit this template

Other trades

Browse all 46 quote templates