Flooring Estimate Template

Square footage, waste factor, underlayment and a subfloor allowance — priced before the carpet comes up. Free PDF, no account.

Edit this template

A floor is priced off a measurement and installed onto whatever is under the old covering. Until the carpet is lifted or the vinyl is scraped, nobody knows whether the subfloor is flat, dry or sound — and all three decide how much work goes in before a single plank is laid. A flooring estimate that names its waste factor, its assumed subfloor condition and its moisture limit is one you can hold to; one that quotes only a price per square foot is a bid you will end up renegotiating on your knees.

ESTIMATE Issued
Estimate number:EST-3310
Date of issue:August 6, 2026
Valid until:September 5, 2026
Currency:USD
Issued by
Northfield Floor Works
914 West 26th Street
55414 Minneapolis, MN
United States
hello@northfieldfloors.example
Bill to
Priya Raghunathan
63 Larkspur Court
55424 Edina, MN
United States
p.raghunathan@example.com
Estimated total
$11,189.40
Valid for 30 more days · Sep 5, 2026
This is an estimate, not a bill. Prices may change.
Measured and assumed
Areas measured on site. The subfloor was checked only at the doorways; flatness across the room is assumed and confirmed once the carpet is up.
Description Qty Rate Tax Amount
Engineered white oak, 7in plank — material
840 sq ft measured plus 10% waste; priced from lot 4471
924$6.85$6,329.40
Installation labour — glue-down
Living, dining and hall; straight lay
840$4.20$3,528.00
Carpet and pad removal, haul-away
Tack strip pulled; staples removed
840$1.10$924.00
Allowance — subfloor levelling
Provisional 12 bags of compound at 34.00, billed as used
12$34.00$408.00
Subtotal$11,189.40
Total$11,189.40
Terms
Material paid on order, labour on completion. Manufacturer's warranty applies only where the moisture limit was met at installation.
Estimate #EST-3310 · Northfield Floor Works · Page 1 of 1

What this estimate commits you to

How long it stands
Thirty days. A dye lot is held for about that long, and material re-ordered later arrives from another run with a shade difference you can see across a room.
What it does not cover
Furniture moving, appliance disconnection and reconnection, removal of old adhesive or asbestos-backed sheet vinyl, baseboard replacement, and any painting where the new floor height changes the reveal.
What would change the price
The subfloor once it is exposed: high spots that need grinding, hollows that need levelling compound past the allowance, squeaks that need screwing off, and any moisture reading above the manufacturer's limit, which pauses the job rather than costing an hour.
How the client accepts it
Sign, confirm the lot and pay for the material up front; installation is scheduled once the boxes have acclimatised in the room for 72 hours, and the lot cannot be changed after it is cut.

Edit this template Free, no account, no watermark — download the PDF when you are done.

What to put on a flooring estimate

  • Square footage by room, and the waste factor added on top — 10 per cent plank, more on a diagonal or herringbone lay
  • The exact product: species, wear layer, plank width and the lot the price was taken from
  • Removal and disposal of the existing covering, priced by what it is — carpet lifts, glued vinyl does not
  • Subfloor preparation as an allowance, with the rate per bag of levelling compound and per hour of grinding
  • Transitions, thresholds, stair nosing and trim, each of which is priced per piece rather than per square foot
  • The moisture reading the manufacturer requires, and that installation stops until the slab meets it

Questions

What waste factor should a flooring estimate show?

Show it as a number rather than burying it. Ten per cent covers a straightforward rectangular room; a diagonal, a herringbone or a floor broken up by angles runs to fifteen or twenty, and a customer comparing two bids deserves to see which one bought enough material to finish.

How do I estimate subfloor repair before the old floor is up?

As an allowance with a unit rate attached — so many bags of levelling compound, so many hours of grinding, at a stated price each. Then measure the subfloor once it is exposed and bill what was used. The alternative is a padded price that loses you the job.

Why does the estimate mention a moisture reading?

Because it is the one condition that can stop the job on the morning it starts. Every manufacturer sets a limit for the slab or the subfloor, installing over a wet one voids the warranty, and drying a slab takes days that belong to nobody's schedule until the estimate says whose they are.

Ready to send it?

The template opens in the editor with these lines already on it. Change what you like, download the PDF.