Engineering Invoice Template
Phases, discipline, stamped deliverables, site visits and reimbursables. Free PDF.
Engineering fees are earned in phases and paid against deliverables, and the deliverable that matters is usually the stamped one. An invoice that names the phase, the discipline and what was issued lets a client match the fee to something they received rather than to time they cannot see.
|
INVOICE
Issued
|
|
Issued by
Thorne Structural Engineering
220 Cantilever Court 37210 Nashville, TN United States accounts@thornestructural.example |
Bill to
Fairmont Builders LLC
900 Construction Way 37064 Franklin, TN United States ap@fairmontbuilders.example |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Structural design — construction documents phase 60% of phase fee, stamped drawings issued for permit | 1 | $14,400.00 | — | $14,400.00 |
Foundation revision Redesign following the geotechnical report, out of base scope | 9 | $215.00 | — | $1,935.00 |
Construction observation Two site visits with written field reports | 2 | $680.00 | — | $1,360.00 |
Reimbursables Large-format plotting and permit submission fee, at cost | 1 | $340.00 | — | $340.00 |
|
Edit this template Free, no account, no watermark — download the PDF when you are done.
What to put on a engineering invoice
- The project name and number, and the phase being billed
- The discipline, where a firm covers more than one — structural, civil, mechanical, electrical
- Deliverables issued in the period, particularly anything stamped
- Site visits and construction observation, counted, since these run past the design phase
- Reimbursables — plotting, travel, permit fees — at cost
- Requests for information and submittal review, if the contract bills them
Questions
Why list the stamped deliverable?
Because it is the thing of value and the thing with liability attached. A client filing for permit needs the stamped set; naming it on the invoice ties the fee to a document that exists rather than to a percentage of a phase.
Should construction observation be billed separately from design?
Yes. It happens months later, it is often hourly where design was fixed fee, and clients who see one combined figure assume the design fee covered the whole project through completion.
Are RFIs and submittals billable?
It depends on the contract, and the invoice should reflect what it says. On a busy project they consume real hours, and a firm that never bills them ends up funding the contractor's coordination out of its design fee.
Ready to bill for it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Environmental Consulting Site assessment — records and reconnaissance · Subsurface investigation — field time · Laboratory analysis
- Equipment Rental Mini excavator, 3.5t — asset EX-114 · Hydraulic breaker attachment · Delivery and collection
- Event Photography Event coverage — six hours · Overtime · Second shooter
- Event Planning Planning fee — phase 2 · Vendor coordination · On-the-day coordination
- Excavation Excavator — 8 ton, with operator · Skid steer — with operator · Haul-off
- Coaching Coaching sessions — 90 minutes · 360 feedback assessment · Sponsor alignment meetings
- Fencing Cedar privacy fence — 6 ft · Gates · Rock excavation
- Flooring Engineered oak, 7in plank · Removal and disposal of carpet · Subfloor levelling