Equipment Rental Invoice Template
Daily and weekly rates, delivery, fuel and damage waiver. Free PDF, no sign-up.
Rental billing turns on dates and hours the customer stopped tracking on day two. The out and in dates, the meter reading at each end, and what the daily rate becomes at a week are the four facts that settle almost every rental dispute, and all four fit on the invoice.
|
INVOICE
Issued
|
|
Issued by
Bedrock Plant Hire
3300 Quarry Road 84104 Salt Lake City, UT United States hire@bedrockplant.example |
Bill to
Sagebrush Site Works LLC
120 Basin Drive 84601 Provo, UT United States accounts@sagebrushsite.example |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Mini excavator, 3.5t — asset EX-114 Weekly rate applied, out Monday, in Friday | 1 | $890.00 | UT Sales Tax (8.45%) | $890.00 |
Hydraulic breaker attachment Four days, daily rate | 4 | $120.00 | UT Sales Tax (8.45%) | $480.00 |
Delivery and collection Low-loader, both ways | 2 | $165.00 | — | $330.00 |
Fuel on return Returned at three-quarters, refilled 14 gallons | 14 | $5.20 | — | $72.80 |
|
Edit this template Free, no account, no watermark — download the PDF when you are done.
What to put on a equipment rental invoice
- Each item by description and asset number
- The out and in dates, and the rate basis applied — daily, weekly or monthly
- Meter hours at collection and return, where the machine bills by the hour
- Delivery and collection charges, separately from the rental
- Fuel, cleaning or damage charges assessed on return
- Damage waiver, if taken, and what it does and does not cover
Questions
How should a part-week rental be billed?
At whichever is cheaper for the customer, and say which you applied. Charging seven daily rates when a weekly rate exists is the fastest way to lose an account that would have rented from you all year.
Should damage waiver be automatic?
It should be a choice, shown as its own line. A waiver charged without being discussed is the line customers most often demand be removed, and removing it after the fact means re-issuing the invoice.
Ready to bill for it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Event Photography Event coverage — six hours · Overtime · Second shooter
- Event Planning Planning fee — phase 2 · Vendor coordination · On-the-day coordination
- Excavation Excavator — 8 ton, with operator · Skid steer — with operator · Haul-off
- Coaching Coaching sessions — 90 minutes · 360 feedback assessment · Sponsor alignment meetings
- Fencing Cedar privacy fence — 6 ft · Gates · Rock excavation
- Flooring Engineered oak, 7in plank · Removal and disposal of carpet · Subfloor levelling
- Food Truck Event minimum — met · Travel and setup · Generator hire
- Foundation Repair Steel piers — driven to refusal · Engineering plan and observation · Excavation and restoration