Land Surveying Invoice Template
Survey type, crew hours, records research, monuments set and plat. Free PDF.
A survey is bought for a specific purpose — a closing, a permit, a fence, a lender — and the type of survey is what the purpose demands. Naming it on the invoice matters because a boundary survey and a mortgage inspection are not interchangeable, and the client who bought the cheaper one usually finds out at the worst moment.
|
INVOICE
Issued
|
|
Issued by
Meridian Line Surveying
44 Benchmark Road 59801 Missoula, MT United States office@meridianlinesurvey.example |
Bill to
Cassandra Vukovic
1180 Rattlesnake Drive 59802 Missoula, MT United States c.vukovic@example.com |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Boundary survey 6.2 acre parcel, full perimeter, performed for a fence and a lot-line question | 1 | $2,400.00 | — | $2,400.00 |
Records research Deeds, prior surveys and easements of record, 7 hours | 7 | $125.00 | — | $875.00 |
Field crew Two-person crew, 14 hours including a return visit for the north line | 14 | $195.00 | — | $2,730.00 |
Monuments set Five corners set with capped rebar and witnessed | 5 | $85.00 | — | $425.00 |
|
Edit this template Free, no account, no watermark — download the PDF when you are done.
What to put on a land surveying invoice
- The survey type by name, and the purpose it was performed for
- The property, by address and by parcel or tax identification number
- Records research, which happens before anyone goes to the field
- Field crew time, and the number of people in the crew
- Monuments set or recovered, counted
- The plat or map delivered, and whether it was recorded
Questions
Why does the survey type belong on the invoice?
Because it defines what the client can use it for. A mortgage inspection is not a boundary survey and will not support a fence, a permit or a dispute, and the invoice is where that distinction survives after the conversation is forgotten.
Should records research be billed separately?
It is real work done before the crew leaves the office — deeds, prior surveys, plats, easements — and on a complicated parcel it is the larger half of the job. Clients who see only field time assume they paid for a morning with a tripod.
Why count monuments?
Because setting them is what makes the boundary findable afterwards, and because they carry cost and liability. A client who wants corners marked is buying something different from a client who wants a drawing.
Ready to bill for it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Landscaping Maintenance visits — April · Border planting — front bed · Shrubs and perennials
- Legal Services Partner time — contract negotiation · Associate time — drafting · Paralegal time — document management
- Limousine Executive sedan — hourly · Airport waiting · Gratuity
- Band Performance — three sets · Load-in, soundcheck and load-out · PA and lighting
- Locksmith Emergency call-out · After-hours premium · Deadbolt replacement
- Market Research Study design and questionnaire · Fieldwork — completed interviews · Respondent incentives
- Marketing Agency Monthly retainer · Campaign build — spring range · Ad spend — paid social and search
- Masonry Chimney rebuild above roofline · Reclaimed brick · Type N lime mortar