Welding Quote Template
Steel by the section, shop hours, coating and field install — tied to a drawing revision. Free PDF, no sign-up.
Fabrication is quoted from a drawing, and that is what makes the number binding: the material take-off is countable, the weld inches are countable, and the finish is specified. What is not countable is the site, so the price is tied to a drawing revision and to a field measure that either agrees with it or does not. State the revision number on the quote and everyone knows which document the price belongs to.
|
QUOTE
Issued
|
|
Issued by
Iron Meridian Fabrication
1900 East 12th Street 16503 Erie, PA United States estimating@ironmeridian.example |
Bill to
Northgate Property Trust
44 Lakeshore Drive 16507 Erie, PA United States projects@northgatetrust.example |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Material take-off — HSS and plate Per drawing S-201 Rev B: 2x2 HSS, 1/4 in. base plates, flat bar infill | 1 | $3,240.00 | — | $3,240.00 |
Shop fabrication Cut, fit and weld four rail sections and two landing guards; 62 shop hours | 62 | $84.00 | — | $5,208.00 |
Powder coating Blast, prime and coat, satin black, outsourced and inspected on return | 1 | $1,180.00 | — | $1,180.00 |
Field installation Set, plumb and anchor; two fitters for one day, 16 hours | 16 | $98.00 | — | $1,568.00 |
|
What this quote commits you to
- How long it stands
- 14 days. Steel is bought against the mill's published extras, and those are re-issued fortnightly.
- What it does not cover
- Engineering stamps and calculations, third-party NDT or x-ray, hot-work permits, galvanising, and any crane or lift on site.
- What would change the price
- A field measure that disagrees with the drawing it was priced from, or a weld procedure calling for a certified WPS we do not already hold.
- How the client accepts it
- Approve the shop drawing and the quote together — fabrication starts from the approved drawing, not from the quote.
Edit this template Free, no account, no watermark — download the PDF when you are done.
When the work is done, invoice it →
What to put on a welding quote
- The drawing number and revision the price was taken off
- Material by section and grade — HSS, angle, plate, and their weights
- Shop hours separated from field hours, because they carry different rates
- Finish: mill scale, primed, powder coated or galvanised, named explicitly
- Weld procedure and whether certification or third-party inspection is required
- Delivery, off-loading and who supplies the lift on site
- Whether the field measure has been taken yet, or the price is from the drawing alone
Questions
Why tie a welding quote to a drawing revision?
Because a revision is how the scope changes without anyone saying so. Rev C with a heavier top rail is a different tonnage and a different price, and naming the revision makes that visible instead of arguable.
How long can steel pricing be held?
About a fortnight for most shops. Mill extras and the plate market move on their own schedule, and a month-long validity on a heavy take-off is a quiet bet against them.
Who pays for engineering stamps?
The client, and the quote should exclude them by name. A stamped calculation is a licensed engineer's liability, not the fabricator's, and pricing it into a fabrication line hides both the cost and the responsibility.
Ready to send it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Architecture Phase 1 — Schematic design · Phase 2 — Design development · Phase 3 — Construction documents
- Bartending Bartenders — 5 hour service · Bar back and ice runner · Mixers, garnish and ice package
- Bookkeeping Monthly bookkeeping — 200-350 transactions · Monthly management reports · Catch-up — prior nine months
- Carpentry Site measure and shop drawings · Bench time — window seat and flanking presses · Fitting on site
- Catering Plated three-course dinner · Passed canapés — reception hour · Service staff
- Cleaning Services Nightly office cleaning · Restroom service · Carpet extraction
- Consulting Workstream 1 — Commercial diagnostic · Workstream 2 — Customer interviews · Board presentation and written report
- DJ Services Reception DJ — 5 hours playing · Ceremony sound system · Set-up, sound check and pack-down