Free — no sign-up, no watermark

Drywall Quote Template

Board count, finish level, corner bead and stock — hanging and taping priced apart. Free PDF, no sign-up.

Edit this template

Drywall is the trade with the clearest unit of work in construction: a sheet is a sheet, and a room takes the number of sheets it takes. That makes a fixed price straightforward and makes the argument move somewhere else — onto the finish level, which is invisible on a quote that only says "drywall". Name the level, price the taping apart from the hanging, and the client can see what the smooth wall actually costs.

QUOTE Issued
Quote number:QUO-7143
Date of issue:September 20, 2026
Valid until:October 20, 2026
Currency:USD
Issued by
Trueline Drywall
88 South Latah Street
83702 Boise, ID
United States
office@truelinedrywall.example
Bill to
Halvorsen Build Co.
2200 Ridgecrest Avenue
83642 Meridian, ID
United States
site@halvorsenbuild.example
Quoted price
$11,422.20
Valid for 30 more days · Oct 20, 2026
Fixed price, valid until October 20, 2026.
Basis of quote
Board counts are taken from the framing plan dated with the drawing set. The price assumes framing is complete, inspected and within a quarter-inch plane tolerance when we arrive.
Description Qty Rate Tax Amount
Hang 1/2 in. board, walls and ceilings
184 sheets, screwed to inspected framing
184$22.00$4,048.00
Hang 5/8 in. type X, garage ceiling and party wall
38 sheets in the fire-rated assembly at plan detail A-6
38$27.00$1,026.00
Tape and finish to level 4
6,840 sq ft: three coats, screw heads spotted, ready for primer
6840$0.68$4,651.20
Level 5 skim — great room
940 sq ft, where the west glazing rakes across the wall
940$0.55$517.00
Stocking and corner bead
Board stocked to the second floor; 420 lf of paper-faced bead
1$1,180.00$1,180.00
Subtotal$11,422.20
Total$11,422.20
Terms
Valid 30 days. Billed at hang complete and at finish complete. Dust containment to the stair opening is included; final clean is by others.
Quote #QUO-7143 · Trueline Drywall Page 1 of 1

What this quote commits you to

How long it stands
30 days. Board and compound are quoted from the supply house's contractor pricing, which is reset at the start of each month.
What it does not cover
Priming and painting, insulation, access panels supplied by others, and removal of debris another trade generated.
What would change the price
A framing survey that finds studs out of plane, since a flat finish over bowed framing is a floating job rather than a taping job.
How the client accepts it
Accept in writing and confirm the framing is complete and inspected — the crew is scheduled against the inspection date, not the signature date.

Edit this template Free, no account, no watermark — download the PDF when you are done.

What to put on a drywall quote

  • Board count and thickness, with 5/8 in. type X called out where the code requires it
  • The finish level by number — level four and level five are different jobs at different money
  • Hanging and taping as separate lines, because they are separate crews
  • Corner bead: metal, paper-faced or bullnose, and how many linear feet
  • Whether stocking the board into the building is included, and up which stair
  • Sanding method, and whether dust containment is priced
  • Who is responsible for the framing being flat enough to finish over

Questions

What does 'level five' add to a drywall quote?

A skim coat over the whole surface, which is another day of labour and another round of sanding. It matters where raking light or a gloss paint will show every joint, and quoting level four while the client pictures level five is where this trade's disputes start.

Should stocking the board be a line item?

Yes, especially above the ground floor. Carrying a hundred sheets up two flights is hours of labour that vanishes into a square-foot rate, and the client who watches it happen has no idea it was ever priced.

What if the framing is not flat?

Say on the quote that the price assumes framing within tolerance and inspected. Floating a bowed wall to a flat finish is a plastering job, not a taping job, and it is the one condition that reliably breaks a drywall price.

About the free quote generator

Is this quote generator really free?

Yes. There is no fee, no trial period and no watermark on the PDF. Nothing on this page requires a credit card.

What is the difference between a quote and an estimate?

A quote is a fixed price you are offering to hold, and it is binding on you once the client accepts it. An estimate is your best projection of the cost and can move if the job does. If the scope is not settled yet, send an estimate instead.

Is a quote legally binding?

Once a client accepts it within the period it stands, a quote generally forms a contract at that price — the details depend on your jurisdiction and on what the document itself says. That is why the price, the scope and the exclusions all belong in writing, and why the document prints the date the offer expires.

How long should a quote be valid until?

Thirty days is the common default, and two weeks is sensible when materials prices are moving. Whatever you choose, state it on the quote: an offer with no expiry is an offer you have made for ever.

Can I raise the price after the client accepts?

Not unilaterally, which is the point of quoting rather than estimating. What you can do is price the variations the client asks for afterwards, provided the quote said what was and was not included.

Do I need to create an account?

No. Fill in the form and download the PDF directly — there is no sign-up and no login for this tool.

Can the client accept the quote online?

Not from a downloaded PDF. Saving the quote to an account gives it a link the client opens and answers on, and the acceptance is recorded against the document rather than living in an email thread.

Can I use this for any currency or country?

Yes. Choose any currency and country for either party — the totals and formatting follow your selection.

Ready to send it?

The template opens in the free quote generator with these lines already on it. Change what you like, download the PDF.

Edit this template

Other trades

Browse all 46 quote templates