Drywall Quote Template

Board count, finish level, corner bead and stock — hanging and taping priced apart. Free PDF, no sign-up.

Edit this template

Drywall is the trade with the clearest unit of work in construction: a sheet is a sheet, and a room takes the number of sheets it takes. That makes a fixed price straightforward and makes the argument move somewhere else — onto the finish level, which is invisible on a quote that only says "drywall". Name the level, price the taping apart from the hanging, and the client can see what the smooth wall actually costs.

QUOTE Issued
Quote number:QUO-7143
Date of issue:August 6, 2026
Valid until:September 5, 2026
Currency:USD
Issued by
Trueline Drywall
88 South Latah Street
83702 Boise, ID
United States
office@truelinedrywall.example
Bill to
Halvorsen Build Co.
2200 Ridgecrest Avenue
83642 Meridian, ID
United States
site@halvorsenbuild.example
Quoted price
$11,422.20
Valid for 30 more days · Sep 5, 2026
Fixed price, valid until September 5, 2026.
Basis of quote
Board counts are taken from the framing plan dated with the drawing set. The price assumes framing is complete, inspected and within a quarter-inch plane tolerance when we arrive.
Description Qty Rate Tax Amount
Hang 1/2 in. board, walls and ceilings
184 sheets, screwed to inspected framing
184$22.00$4,048.00
Hang 5/8 in. type X, garage ceiling and party wall
38 sheets in the fire-rated assembly at plan detail A-6
38$27.00$1,026.00
Tape and finish to level 4
6,840 sq ft: three coats, screw heads spotted, ready for primer
6840$0.68$4,651.20
Level 5 skim — great room
940 sq ft, where the west glazing rakes across the wall
940$0.55$517.00
Stocking and corner bead
Board stocked to the second floor; 420 lf of paper-faced bead
1$1,180.00$1,180.00
Subtotal$11,422.20
Total$11,422.20
Terms
Valid 30 days. Billed at hang complete and at finish complete. Dust containment to the stair opening is included; final clean is by others.
Quote #QUO-7143 · Trueline Drywall · Page 1 of 1

What this quote commits you to

How long it stands
30 days. Board and compound are quoted from the supply house's contractor pricing, which is reset at the start of each month.
What it does not cover
Priming and painting, insulation, access panels supplied by others, and removal of debris another trade generated.
What would change the price
A framing survey that finds studs out of plane, since a flat finish over bowed framing is a floating job rather than a taping job.
How the client accepts it
Accept in writing and confirm the framing is complete and inspected — the crew is scheduled against the inspection date, not the signature date.

Edit this template Free, no account, no watermark — download the PDF when you are done.

What to put on a drywall quote

  • Board count and thickness, with 5/8 in. type X called out where the code requires it
  • The finish level by number — level four and level five are different jobs at different money
  • Hanging and taping as separate lines, because they are separate crews
  • Corner bead: metal, paper-faced or bullnose, and how many linear feet
  • Whether stocking the board into the building is included, and up which stair
  • Sanding method, and whether dust containment is priced
  • Who is responsible for the framing being flat enough to finish over

Questions

What does 'level five' add to a drywall quote?

A skim coat over the whole surface, which is another day of labour and another round of sanding. It matters where raking light or a gloss paint will show every joint, and quoting level four while the client pictures level five is where this trade's disputes start.

Should stocking the board be a line item?

Yes, especially above the ground floor. Carrying a hundred sheets up two flights is hours of labour that vanishes into a square-foot rate, and the client who watches it happen has no idea it was ever priced.

What if the framing is not flat?

Say on the quote that the price assumes framing within tolerance and inspected. Floating a bowed wall to a flat finish is a plastering job, not a taping job, and it is the one condition that reliably breaks a drywall price.