Free — no sign-up, no watermark

Fencing Quote Template

Linear feet, post spacing, gates and grade — priced from a walked line. Free PDF, no sign-up.

Edit this template

A fence is a length, a height and a post count — all of them known from a walk of the line with a wheel — so the price can be fixed before anyone digs. Two things routinely break it, and neither is a mystery: what is under the post holes, and where the boundary actually runs. A fencing quote that names both is a fixed price that survives contact with the yard.

QUOTE Issued
Quote number:QUO-3352
Date of issue:September 20, 2026
Valid until:October 20, 2026
Currency:USD
Issued by
Longstile Fence Company
902 East Main Street
37402 Chattanooga, TN
United States
quotes@longstilefence.example
Bill to
Rosalind Petrakis
245 Willowbend Drive
37343 Hixson, TN
United States
r.petrakis@example.com
Quoted price
$9,563.00
Valid for 30 more days · Oct 20, 2026
Fixed price, valid until October 20, 2026.
The line
Priced from the line walked with you and flagged on the day of the visit. We build to your flags; if a survey later disagrees with them, moving the fence is separate work.
Description Qty Rate Tax Amount
6 ft cedar privacy fence
214 linear feet of dog-ear pickets, posts at 8 ft centres, racked to grade
214$31.00$6,634.00
4x4 posts set in concrete
28 in. depth, two bags per hole
28$42.00$1,176.00
Gates
One 4 ft walk gate, one 10 ft double drive gate with drop rod
2$395.00$790.00
Remove and haul existing chain link
The full 214 ft run including posts and footings
214$4.50$963.00
Subtotal$9,563.00
Total$9,563.00
Terms
Valid 30 days. 30% on scheduling, balance on completion. Cedar will weather to grey; that is the timber, not a defect.
Quote #QUO-3352 · Longstile Fence Company Page 1 of 1

What this quote commits you to

How long it stands
30 days, with cedar and steel posts priced from the yard's current list; a run re-measured on site is quoted again before we dig.
What it does not cover
Survey and boundary staking, permits and HOA approvals, tree or root removal, and repair to irrigation lines that were not marked.
What would change the price
Rock or buried concrete in a post hole, charged per hole, and a grade change that turns a racked run into a stepped one.
How the client accepts it
Sign the quote once you have flagged your own boundary; we set posts to the line you mark, not to the deed.

Edit this template Free, no account, no watermark — download the PDF when you are done.

What to put on a fencing quote

  • Linear feet by style and height, with post spacing stated
  • Post material and set depth, and whether they are concreted
  • Gates counted individually, with width, hardware and swing direction
  • Grade: whether the run is racked to follow the ground or stepped
  • Removal and disposal of the existing fence, if there is one
  • Utility locate scheduled before digging, and who calls it in
  • The boundary line the price is built on, and who is responsible for marking it

Questions

Who is responsible for the property line?

The homeowner, and the quote should say so outright. A fence company builds to the line it is shown; a fence built eighteen inches over is a survey dispute and a rebuild, and the sentence that prevents it costs nothing to write.

How should rock in a post hole be handled?

As a named per-hole rate on the quote. Every fencer hits it eventually, and a client who has read the rate in advance treats it as a condition of the ground rather than as an invoice that grew.

Does a sloped yard cost more?

It changes the method, which is where the cost is. Racking follows the grade and stepping keeps panels level with gaps underneath, and they take different pickets and different hours — so say which one the price assumes.

About the free quote generator

Is this quote generator really free?

Yes. There is no fee, no trial period and no watermark on the PDF. Nothing on this page requires a credit card.

What is the difference between a quote and an estimate?

A quote is a fixed price you are offering to hold, and it is binding on you once the client accepts it. An estimate is your best projection of the cost and can move if the job does. If the scope is not settled yet, send an estimate instead.

Is a quote legally binding?

Once a client accepts it within the period it stands, a quote generally forms a contract at that price — the details depend on your jurisdiction and on what the document itself says. That is why the price, the scope and the exclusions all belong in writing, and why the document prints the date the offer expires.

How long should a quote be valid until?

Thirty days is the common default, and two weeks is sensible when materials prices are moving. Whatever you choose, state it on the quote: an offer with no expiry is an offer you have made for ever.

Can I raise the price after the client accepts?

Not unilaterally, which is the point of quoting rather than estimating. What you can do is price the variations the client asks for afterwards, provided the quote said what was and was not included.

Do I need to create an account?

No. Fill in the form and download the PDF directly — there is no sign-up and no login for this tool.

Can the client accept the quote online?

Not from a downloaded PDF. Saving the quote to an account gives it a link the client opens and answers on, and the acceptance is recorded against the document rather than living in an email thread.

Can I use this for any currency or country?

Yes. Choose any currency and country for either party — the totals and formatting follow your selection.

Ready to send it?

The template opens in the free quote generator with these lines already on it. Change what you like, download the PDF.

Edit this template

Other trades

Browse all 46 quote templates