Demolition Invoice Template
Structure, disposal loads, disconnects, permits and salvage. Free PDF, no account.
Most of a demolition bill is not knocking the building down — it is what the debris costs to take away and what had to happen before anyone could start. Disconnects, permits and abatement are the front half of the job and the part a customer never pictures, so they belong on lines of their own.
|
INVOICE
Issued
|
|
Issued by
Ironhand Demolition
5100 Wrecking Road 14203 Buffalo, NY United States office@ironhanddemo.example |
Bill to
Northbank Development Corp.
12 Riverfront Plaza 14202 Buffalo, NY United States ap@northbankdev.example |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Structure demolition Detached two-storey frame building, approx. 2,400 sq ft, to slab | 1 | $14,800.00 | — | $14,800.00 |
Disposal Mixed construction debris, 22 loads to the transfer station | 22 | $410.00 | — | $9,020.00 |
Pre-demolition hazardous material survey Required before permit; asbestos found in floor tile mastic | 1 | $1,250.00 | — | $1,250.00 |
Asbestos abatement Licensed abatement of floor tile mastic, with air clearance | 1 | $6,400.00 | — | $6,400.00 |
|
Edit this template Free, no account, no watermark — download the PDF when you are done.
What to put on a demolition invoice
- The structure and its approximate size, since disposal scales with it
- Utility disconnects, each named, because they must precede the work and are scheduled by others
- Permits and any required notification, at cost
- Hazardous material survey and abatement, which is separate work by separate licence
- Disposal counted by the load or by the ton, with where it went
- Salvage credited back, where materials were recovered and sold
Questions
Why are disconnects billed separately?
Because they are scheduled by utilities on their own timetable and they gate the whole job. Showing them separately explains why a demolition quoted in March started in May, and it makes clear the delay was not idle time you charged for.
Should a hazardous material survey be on the invoice?
Yes, and separately from any abatement it triggered. Pre-demolition surveys are required for most structures of any age, and abatement is licensed work with its own paperwork that the customer may need to produce later.
How do salvage credits work?
Show them as their own line reducing the total rather than quietly lowering the demolition price. A customer who sees the credit understands what recovering the timber or the fixtures was worth, and it makes the disposal figure beside it legible.
Ready to bill for it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- DJ Performance — five hours · Setup, soundcheck and breakdown · Lighting package
- Document Shredding Scheduled service — 64 gal consoles · One-off purge · Hard drive destruction
- Dog Grooming Full groom — medium, double coat · De-matting · Nail trim and ear clean
- Doula Prenatal visits · Labour and delivery support · Postpartum visits
- Driving School Behind-the-wheel lessons · Classroom instruction · Test day — vehicle and instructor
- Dry Cleaning Guest garments — jackets and coats · Guest garments — shirts and blouses · Table linen
- Drywall Board hung — 5/8 in., 4x12 · Tape and finish — Level 4 · Level 5 skim — great room
- Elder Care Personal care hours · Companion care hours · Respite cover