Drywall Invoice Template
Sheets hung, finish level, taping and texture — priced the way drywall is. Free PDF.
Drywall is priced by the sheet and judged by the finish, and the finish is where the arguments happen. A Level 3 wall under flat paint and a Level 5 wall under a gloss are different jobs at the same square footage, so the level belongs on the invoice as plainly as the sheet count.
|
INVOICE
Issued
|
|
Issued by
Trueline Drywall Co.
2200 Gypsum Road 89102 Las Vegas, NV United States billing@truelinedrywall.example |
Bill to
Sandoval Custom Homes
700 Builder Way 89014 Henderson, NV United States ap@sandovalhomes.example |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Board hung — 5/8 in., 4x12 Ceilings and walls, lot 14 | 186 | $16.50 | — | $3,069.00 |
Tape and finish — Level 4 Three coats, sanded, ready for primer | 8900 | $0.62 | — | $5,518.00 |
Level 5 skim — great room Full skim coat where the glazing rakes the wall | 940 | $1.15 | — | $1,081.00 |
Waste removal Offcuts and packaging, two loads | 2 | $180.00 | — | $360.00 |
|
Edit this template Free, no account, no watermark — download the PDF when you are done.
What to put on a drywall invoice
- Sheets hung, by thickness and size
- The finish level — Level 3, 4 or 5 — stated explicitly
- Taping and mudding coats, where you bill them apart from hanging
- Texture, if any, by type: knockdown, orange peel, smooth
- Corner bead, and any arch or curved work, which is not sheet-rate work
- Waste removal, since drywall offcuts fill a skip fast
Questions
Why does the finish level matter on the invoice?
Because it is the difference between a wall that passes and a wall that shows every seam under a raking light. Level 5 costs materially more than Level 4, and a customer who was quoted one and billed the other has no way to tell without the invoice saying which was done.
Should hanging and finishing be separate lines?
If you do both, yes. They are separate trades in most of the country and separate crews on larger jobs, and splitting them lets a builder compare your price to the two quotes they already have.
Ready to bill for it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Elder Care Personal care hours · Companion care hours · Respite cover
- Electrical Service panel, 200A · Panel replacement labour · Dedicated circuit — kitchen
- Phone Repair Diagnostic · Display assembly — aftermarket · Battery replacement
- Engineering Structural design — construction documents phase · Foundation revision · Construction observation
- Environmental Consulting Site assessment — records and reconnaissance · Subsurface investigation — field time · Laboratory analysis
- Equipment Rental Mini excavator, 3.5t — asset EX-114 · Hydraulic breaker attachment · Delivery and collection
- Event Photography Event coverage — six hours · Overtime · Second shooter
- Event Planning Planning fee — phase 2 · Vendor coordination · On-the-day coordination