Tile Installation Invoice Template
Square footage, waterproofing, setting material, grout and trim. Free PDF, no account.
Tile is bought by the square foot and fails at the substrate. Waterproofing, backer board and the setting material are invisible in the finished room and are most of what separates a shower that lasts twenty years from one that leaks in three — so they are the lines that need naming rather than absorbing.
|
INVOICE
Issued
|
|
Issued by
Terrazzo & Field Tile Co.
19 Setting Bed Lane 33602 Tampa, FL United States book@terrazzofield.example |
Bill to
Delphine Marchetti
455 Bayshore Court 33611 Tampa, FL United States d.marchetti2@example.com |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Shower — waterproofing system Bonded membrane to walls, pan and curb, flood tested | 1 | $780.00 | — | $780.00 |
Wall tile set — 12x24 porcelain Shower and surround, one-third offset | 118 | $11.50 | — | $1,357.00 |
Floor mosaic — hex Shower floor, cut to the drain | 16 | $22.00 | — | $352.00 |
Epoxy grout and trim Stain-resistant grout, anodised edge profile, 34 linear ft | 1 | $465.00 | FL Sales Tax (7.5%) | $465.00 |
|
Edit this template Free, no account, no watermark — download the PDF when you are done.
What to put on a tile installation invoice
- The area in square feet, by room and surface
- Substrate preparation: backer board, levelling, removal of the old surface
- Waterproofing membrane in wet areas, named by system
- Setting material and grout by type — epoxy grout is not cement grout
- Trim, bullnose and Schluter profiles, counted by the linear foot
- Any pattern work — herringbone, mosaic, large format — which is not flat-rate labour
Questions
Why itemise waterproofing?
Because it is the part of a shower nobody can see and everybody depends on. A named membrane system on the invoice is what a homeowner shows a warranty claim or a buyer's inspector; "tile installation" alone proves nothing was done at all.
Should pattern work cost more?
It usually does — a herringbone or a large-format layout carries more cuts, more waste and more setting time than a straight lay. Bill it as its own line so the square-foot rate stays comparable to the quotes the customer is holding.
Ready to bill for it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Towing Hook-up — light duty · Loaded mileage · Winching
- Translation Translation ES>EN — witness statements · Second-linguist revision · Certification
- Tree Service Removal — Douglas fir, approx. 90 ft · Crown reduction — big-leaf maple · Stump grinding
- Trucking Linehaul — Little Rock to Atlanta · Fuel surcharge · Detention at delivery
- Tutoring Mathematics lessons — in person · Mathematics lessons — online · Practice papers and marking
- Upholstery Sofa — strip and rebuild · Fabric · Foam and dacron
- Veterinary Examination — sick visit · Radiographs — two views · Sedation and monitoring
- Videography Shoot day — crew of four · Edit and colour · Deliverables