Painting Quote Template
Prep, primer, two coats and the colour schedule, priced room by room. Free PDF, no sign-up.
Paint is the cheapest part of a painting job and the only part most clients look at. Everything that decides the price — how much sanding, whether the trim is being filled, how many coats the colour change needs — is decided before a brush is opened, which is exactly why a painter can bind to a number. Put the prep on the document as its own money, and the quote stops looking like an argument about the cost of a gallon.
|
QUOTE
Issued
|
|
Issued by
Fenwick & Sons Painting
15 Rutledge Avenue 29403 Charleston, SC United States hello@fenwickpainting.example |
Bill to
Yolanda Prescott
740 Palmetto Grove 29464 Mount Pleasant, SC United States y.prescott@example.com |
| Description | Qty | Rate | Tax | Amount |
|---|---|---|---|---|
Surface preparation — interior Wash, sand, fill nail holes, caulk trim joints; five rooms, 34 hours | 34 | $52.00 | — | $1,768.00 |
Stain-blocking primer, walls and ceilings 2,180 sq ft: one coat, water-based, over patched areas and the full dining room | 2180 | $0.42 | — | $915.60 |
Two finish coats, walls Eggshell, colour schedule attached; 2,180 sq ft | 2180 | $0.88 | — | $1,918.40 |
Trim, doors and casings Semi-gloss enamel; 11 doors counted per side, 260 lf of baseboard | 1 | $1,640.00 | — | $1,640.00 |
Masking and floor protection Rosin paper, plastic to cabinetry, daily clean-down | 1 | $380.00 | — | $380.00 |
|
What this quote commits you to
- How long it stands
- 45 days, and colour selections are due two weeks before the start date — paint changed after batching is re-quoted at the new gallon count.
- What it does not cover
- Lead-safe containment on pre-1978 substrates, carpentry repair to rotten trim, and moving anything heavier than one person can carry.
- What would change the price
- Substrate found failing once the wash is done: chalked stucco, peeling back to bare wood, or a wall needing a bonding primer we did not scope.
- How the client accepts it
- Sign the colour schedule as well as the price — the schedule is what the crew works from on the morning they arrive.
Edit this template Free, no account, no watermark — download the PDF when you are done.
When the work is done, invoice it →
What to put on a painting quote
- Prep by name: wash, scrape, sand, fill, caulk — each is labour somebody is paying for
- Primer stated as its own coat, not folded into 'two coats'
- The coat count, and whether a dark-to-light colour change needs a third
- Surfaces broken out: walls, ceilings, trim, doors, and doors counted per side
- The product line and sheen per surface, so the client can price the paint themselves
- Masking and floor protection, and who moves the furniture
- The colour schedule as an attachment the crew will actually work from
Questions
Should a painting quote be by the square foot or by the room?
Quote the room and show the square footage that produced it. The measure proves the number is not a feeling; the room is what the client is imagining while they read it.
When do colours have to be chosen?
Before the paint is batched, and the quote should say so with a date attached. A colour changed after the store has mixed five gallons is a re-quote, and it is much easier to say that in advance than on the morning it happens.
How do you quote a house built before 1978?
Price the lead-safe work as an explicit option, or exclude it and say what triggers it. RRP containment is real money and real time, and a quote that quietly assumes it away is one you will have to reopen.
Ready to send it?
The template opens in the editor with these lines already on it. Change what you like, download the PDF.
Edit this templateOther trades
- Pest Control Initial German cockroach treatment · Follow-up services · Exterior perimeter treatment
- Photography Wedding coverage — 8 hours · Second photographer — 6 hours · Editing and online gallery
- Pressure Washing House wash — vinyl siding · Driveway and walkways · Rear deck
- Property Management Management fee — 14 units · Leasing fee — new tenancy · Renewal fee
- Proposal Option A — Discovery and data audit · Option A — Order sync remediation · Option A — Nightly batch retirement and cutover
- SaaS Platform subscription — Professional, per seat · Analyst seats — Enterprise tier · Sandbox environment
- Sales Bearing housing, part 44-2210-B · Sealing kit, part SK-880 · Hex bolt assortment, part HB-M12
- Security Guard Unarmed officer — gatehouse, nights · Roving patrol officer — weekends · Field supervisor visits